Sunday, February 22, 2015

More onsite job work

Last day, Thursday: The team photographers found some of the volunteers doing exterior work as part of the rehab at 6194 Grenada St.

STEPS AT FRONT DOOR AND ALSO SIDE DOOR:

ANDY AND ED REPLACING TREDS ON THE FRONT STEPS


STEVE DOING THE SAME AT THE SIDE ENTRY

REHAB THE BACKYARD SHED WITH A NEW DOOR:

DENNIS INSTALLS A NEW HASP

A LEFTOVER PAINT WASHUP PIX!

BARBARA WITH THE WASH HOSE

And finally, Linda had worked in the attic of the second house we were assigned on Grenada St. It was a tough job and when finished, she went back to our rooms for a shower. That was OK, but then she couldn't find the return route to the job site. Exhausting efforts and many turns and with no result, she called for help. A car went to her location and she followed back. Yeah ... Here is Linda returned to the site.

LINDA, "THANKS FOR COMING TO MY RESCUE!"


No comments: