Good news is that we had a warm day on the worksite today. Even though it rained overnight and the ground was muddy we ae pleased to shed the extra jackets and layers of warm clothing.

House 1. With the requirements to withstand hurricane winds, the roof plywood has to be nailed every 4" at the edges and every 6" in the field. That  is a lot of nails, and although all the wood was in place on Monday, nailing continued this morning. Inspector was on site this afternoon, and all is OK.
TAKING IT EASY ON THE FINISHED ROOF.

House 2. Another day of siding. Finished the side above, worked around on the front and the second side. Precise measuring and cutting makes a perfect result with "hardy board" siding. Later it will be painted with 2 coats.

Here is some scenes from Tuesday: