House 1. With the requirements to withstand hurricane winds, the roof plywood has to be nailed every 4" at the edges and every 6" in the field. That is a lot of nails, and although all the wood was in place on Monday, nailing continued this morning. Inspector was on site this afternoon, and all is OK.
![]() |
TAKING IT EASY ON THE FINISHED ROOF. |

House 2. Another day of siding. Finished the side above, worked around on the front and the second side. Precise measuring and cutting makes a perfect result with "hardy board" siding. Later it will be painted with 2 coats.
Here is some scenes from Tuesday:
No comments:
Post a Comment