So, on top of the block, blue "sill seal" was put into place. This prevents moisture and bugs from slipping through under the house. Plastic was put on the ground within the block foundation and will further reduce moisture buildup. Pressure-treated 8 inch "sill" was drilled and installed; then 10 inch pressure-treated joists were bolted in place. Last step was to get the floor joists set across the span, into place.
Voila! Ready for the floor decking.