Wednesday, February 23, 2011

WEDNESDAY -- Making the deck

Paterson group was moved to a new project today. Next to the house we framed yesterday, we were now tasked with prepping for the deck. Our foundation was in, but we had to build from there.

So, on top of the block, blue "sill seal" was put into place. This prevents moisture and bugs from slipping through under the house. Plastic was put on the ground within the block foundation and will further reduce moisture buildup. Pressure-treated 8 inch "sill" was drilled and installed; then 10 inch pressure-treated joists were bolted in place. Last step was to get the floor joists set across the span, into place.

Voila! Ready for the floor decking.

ANDY DRILLING THE LONG SILL BOARDS.
Here's a sample of the work in progress:












BOARDS CUT TO LENGTH BY BARB.

DEB USES RATCHET WRENCH TO BOLT JOISTS IN PLACE.

AT END OF DAY OUR FINISHED WORK!